“Ask RC3” Discusses Buried Treasure Pavement Preservation

Q: I’ve been following the resurfacing of Phoenix freeways for several years—specifically, the removal of worn-out sections of rubberized asphalt and the subsequent pavement rehabilitation using diamond grinding. Is this removal/rehabilitation option unique to rubberized asphalt roadways?

A: No, this “buried treasure” technique can be used on any pavement with an asphalt overlay atop structurally-sound concrete pavement—and many DOTs have used it for decades as a cost-effective treatment!

According to the American Concrete Pavement Association (ACPA), more than a million square yards of buried treasure projects are scheduled in Phoenix for the 2026 construction season. The entirety of the buried treasure work on Phoenix’s highways is estimated to be approximately 4-5 million square yards and is projected to save the owner over $4 billion in life-cycle resurfacing costs.

The buried treasure process begins with non-destructive testing to assess the condition of the underlying concrete pavement. Once the asphalt is removed, concrete pavement preservation (CPP) techniques are employed to restore the pavement for use as a driving surface. Diamond grinding is particularly effective, as it addresses issues like faulting, slab warping, wear from studded tires, and unevenness caused by patching. Additionally, diamond grinding improves macrotexture and skid resistance. The result is a smooth, uniform pavement profile ready for use.

An International Grooving & Grinding Association (IGGA) fact sheet on buried treasure explains the process and CPP treatment options in detail, and enumerates its benefits:

  • LONG LASTING: Caltrans research has shown that the average life of a diamond ground surface in their state is 17 years.
  • BETTER FOR THE ENVIRONMENT: CPP is a sustainable pavement repair option, offering a smaller carbon footprint as compared to asphalt concrete overlay.
  • SIMPLE: No need for guide rail, sign or shoulder/slope modifications.
  • CPP can be completed in off-peak hours with short and mobile lane closures.
  • EXPEDIENCY: CPP can be advertised, bid, let and completed in a short period of time.
  • FLEXIBILITY: Portland cement concrete pavement (PCCP) can be rehabbed using CPP up to three times with little loss of structural or load carrying capacity. Further, applying CPP in one lane doesn’t require application in an adjacent lane.
  • COST-EFFECTIVE: CPP often costs less than thin asphalt concrete overlays.
  • SMOOTH RIDE: CPP with diamond grinding is smooth, and it retains this smoothness longer than alternative surfaces on properly constructed concrete pavement.
  • QUIET: Diamond ground surfaces are typically much quieter than alternative surface textures applied to concrete pavement.
  • SAFE: CPP with diamond grinding is safe. WisDOT has shown that a diamond ground surface has 42% fewer accidents in dry and wet conditions as compared to a tined pavement surface.
  • FUEL EFFICIENCY: CPP with diamond grinding saves fuel. Studies have shown that rigid concrete surfaces exert less rolling resistance than flexible surfaces, thereby saving fuel.
  • PROVEN: CPP has been used by many DOTs for decades, dating back to its first use in California in 1965.