In recent years, there has been an increase in the number of reports of surface distress in young concrete slabs over the spring. Most of these reports focus on concrete flatwork and hand placements, and avoiding these issues with new materials requires adherence to best practices.
The mechanisms behind these distresses have long been known. (For more information on distress mechanisms, see the National Concrete Consortium’s “Map Brief Summer 2023: Revisiting Concrete Scaling.”) However, work is continuing to better understand the impacts of newer cements as well as other novel materials in finishing, and how construction practices need to be modified. Data are showing that longer set times, coupled with reduced bleed rates, can lead to an increased risk of finishing activities being conducted too soon. To reduce the potential impacts of freezing and thawing cycles on early-age concrete surfaces (i.e., scaling), it is still best practice to avoid adding water to the surface as part of finishing, and this practice should be followed for all concrete placements. When novel materials are utilized, such as finishing aids and evaporation retarders, they should be used following the manufacturer’s recommendations. Additionally, proper curing of concrete is still essential to effectively hydrate the cement and deliver durable concrete pavement and flatwork. (See the National Concrete Pavement Technology Center’s “Integrated Materials and Construction Practices for Concrete Pavement: A State-of-the-Practice Manual.”) Efforts are underway to develop best practice guidance to assist crews in making informed decisions when doing their work.